Home Page
Articles
About
Cooperation
Copyright © 2024 RebarDetailing.info All Rights Reserved.
Home Page
Forms
Articles
About
Cooperation
Rebar Detailing Project Difficulty Assessment
Project Difficulty Assessment
Form
1. Project Size:
Small (up to 500 tons of steel)
Medium (500-1000 tons of steel)
Large (over 1000 tons of steel)
2. Geometric Complexity:
Simple
Medium
Complex
3. Number of Structural Elements:
Small (up to 50 elements)
Medium (50-150 elements)
Large (over 150 elements)
4. Type of Structure:
Standard (simple reinforced concrete structures)
Non-standard (prestressed structures, arches, domes, etc.)
5. Availability of Documentation and Design Guidelines:
Comprehensive
Moderate
Limited
6. Special Requirements:
None
Low (e.g. unusual joints)
High (e.g. seismic requirements, quality control)
7. Completeness of Available Documentation:
Complete
Partial
Incomplete
8. Availability of Human Resources:
Sufficient
Limited
Very Limited
9. Experience of the Project Team:
Highly Experienced
Average Experience
Little Experience
10. Deadline Requirements:
Flexible
Moderately Tight
Very Tight
11. Potential Risks:
Minimal (standard project risks)
Medium (delays, logistical risks)
High (design changes, supply issues)
12. Interdisciplinary Coordination:
Minimal (few cooperating disciplines)
Medium (several cooperating disciplines)
High (complex projects with many disciplines)
13. Changes in the Project During Execution:
Unlikely
Moderate Probability
High Probability
Back
Next
Calculate
Back to Top